Kahului Airport re-roofing project included a total of 5 roofs that covered about 130,000sq.ft. over the ticketing and baggage areas.

The roofing system installed was Sarnafil PVC and the colors selected were Energy Smart Tan and Evergreen to match neighboring roofs.

Kahului Airport was a high security project thus adherence to strict protocols were in place as safety and zero impact to airport operations were of utmost importance.

CRW had to adhere to extreme protocols under the directive of GC Johnson Controls, for personnel access, safety set up, staging, loading and disposal of materials, installation and lighting for night work.

About 80% of the work done had to be completed during night hours to best accommodate the airport operations with minimal disruptions.

Due to the high winds in the area, all materials had to be double and triple secured to the roofs.

All roofs had to be completed timely and to spec in order to meet protocols for solar PV installations that were coming shortly after the roofs were inspected and warranted by the manufacturers’ representative.

At final inspection of the project, minimal punch list items were identified.

Our Projects

Project images

DOE/Leilehua HS – Gym (Bldg. R)

Project images

St. Francis Medical Center

Project images

Aston Kaanapali Shores

Project images

Hilton Waikoloa Beach Resort

Project images

Maunalani Nursing & Rehabilitation Center

Project images

Kahului Airport

Project images

Windward Harbour AOAO

Project images

Makakilo Cliffs AOAO